Together with our colleagues at Stadsbader, we are taking significant measures to improve road and cycling safety in Wervik and Hooglede.
In Wervik, works on the N58 are at full speed
By constructing two new cycling tunnels, we are creating not only safe and conflict-free intersections but also better traffic flow. In just two months, we completed phase one. During this short period, our teams moved no less than 10,700 m³ of soil and used 212 tons of steel to outline the cycling tunnels.
In Hooglede, key milestone for the new cycling tunnel on the R32
We built a cofferdam with a braced sheet pile construction. This contains over 362 tons of steel and sheet piles up to 16 m long. This cycling tunnel will also significantly reduce conflicts between cyclists and motorized traffic.