Railway Tunnel Tongeren

Location
Tongeren
Client
Agentschap Wegen en Verkeer Limburg
Start of the construction
1/2025
End of the construction
12/2025

In Tongeren, we are constructing a tunnel beneath the railway line between Liège and Tongeren. The tunnel was built next to the tracks, and during a temporary line closure, we moved the approximately 5,600-ton structure into its final position.