E42 Dassoulx-Andenne

Location
E42 between Dassoulx and Andenne in both directions
Client
Public Service of Wallonia / Sofico
Start of the construction
08/2017
End of the construction
08/2018

E42 - Rehabilitation and construction of 3 lanes

For this project, we built a third lane on the E42 freeway in both directions over a distance of 13 x 2 kilometers. This included the renovation of the bridges above and below the freeway as well as the renovation of the existing asphalt pavement. 
Similar work was completed on the ramps, including additional work on two carpool parking areas at Exits 10A (Fernelmont) and 10 (Hingeon), and dredging of stormwater basins (7) along the section.