Denderleeuw Kemel bridge

Location
Denderleeuw
Client
Infrabel S.A.
Start of the construction
09/2015
End of the construction
08/2017

Denderleeuw Kemel bridge

We broke down old bridge during an outage of the tracks. The construction of the new bridge consisted of assembling various smaller components in prefabricated steel, encased in concrete (=maintenance-free preservation of steel). In a second phase we encased the steel nodes with concrete on site. We also adapted the slip roads.