Location
Courrière
Client
Infrabel sa
Start of the construction
09/2014
End of the construction
11/2017

Brussels/Luxembourg - Line 162: Namur - Sterpenich - Parcel: Courrière / Ciney - Various civil engineering works

For the civil engineering part:

  • Demolition of old ledges
  • Construction of drainage channel (including delivery of prefabricated concrete elements)
  • Temporary relocation, protection and reinstallation of cables (signalling, high voltage, fibre optics)
  • Construction of track crossings for the installation of cable ducts and/or hydraulic passages
  • Construction of base plates for signal boxes
  • Work on service bridges at PI or PD

Construction of reinforced concrete catenary structures; the structures can either be prefabricated and then brought into place and stabilised by micropiles, or cast in place (drilled or prismatic excavations).