Courrière-Ciney
Location
Courrière
Client
Infrabel sa
Start of the construction
09/2014
End of the construction
11/2017
Brussels/Luxembourg - Line 162: Namur - Sterpenich - Parcel: Courrière / Ciney - Various civil engineering works
For the civil engineering part:
- Demolition of old ledges
- Construction of drainage channel (including delivery of prefabricated concrete elements)
- Temporary relocation, protection and reinstallation of cables (signalling, high voltage, fibre optics)
- Construction of track crossings for the installation of cable ducts and/or hydraulic passages
- Construction of base plates for signal boxes
- Work on service bridges at PI or PD
Construction of reinforced concrete catenary structures; the structures can either be prefabricated and then brought into place and stabilised by micropiles, or cast in place (drilled or prismatic excavations).