Blankenberge - flooding measures around the marina
Stom walls, environmental and road works
STADSBADER CONTRACTORS carried out the works around Blankenberge marina. These works are part of the coastal safety master plan. In September 2016, the construction of these architectural storm walls started together with the redevelopment of the surroundings and the roadway around the harbour.
The result is impressive. The focus was on both the technical and aesthetic side of the marina. High-quality details were chosen: tiles, benches, cover stones, etc. The materials used are also of high quality, so that the overall picture is correct.
The marina is a nice calling card for the city of Blankenberge. It is now a safer, more stylish and greener marina.