Aalter Beernem Bridging

Location
Aalter-Beernem-Nevele
Client
Infrabel
Start of the construction
12/2016
End of the construction
06/2018

Bridging of Weitingstraat (KW4), Knesselaarsestraat (KW14) and Galgeveld (KW16)

This project is a continuation of the successful collaboration with TUC RAIL during the Beernem level crossing removal project (13133). Once again, it is part of Infrabel's objective to extend the L50A between Brussels and Bruges from two to four tracks. To achieve this, we were responsible for the renewal and/or modification of three structures. Not only the actual works, but also the study for these works was successfully carried out by Joint Venture.